A major Adobe Experience Manager upgrade is less about pressing a button and more about knowing what your site depends on. Most problems come from custom components, integrations and dispatcher rules nobody remembered. This guide walks through the planning steps that keep a major upgrade predictable: inventory, staging, testing, scheduling and rollback.
Start by confirming which deployment model you run
Your plan depends on how Adobe Experience Manager (AEM) is hosted. There are two main models, and they behave very differently.
- AEM as a Cloud Service: Adobe applies updates continuously. Your work is keeping custom code compatible and testing in your non-production environments, not scheduling a big install.
- AEM on-premise or Adobe Managed Services: You or your partner install service packs, security fixes and major version changes on a schedule you control. This is where a full upgrade plan matters most.
If you are moving from the second model to the first, treat it as a migration project with its own code review, not a routine upgrade. Adobe’s documentation on Experience Manager on Experience League covers the upgrade and migration paths for each model, and it is the reference to check before you commit to a timeline.
Inventory your add-ons and custom code
AEM is Java-based, so your customisations live in places a PHP developer would not look. Build a written inventory before you touch anything. Include:
- Custom components and templates built by your team or an agency.
- OSGi bundles and their configurations, including any third-party bundles.
- Dispatcher configuration: caching rules, filters, rewrite rules and vhosts.
- Integrations: analytics, tag management, search, personalisation, CRM and email tools, plus any API the site calls or exposes.
- Workflows, scheduled jobs and replication agents that run without anyone watching them.
- Content packages and overlays that change standard authoring or admin behaviour.
For each item, note who owns it, what it does, whether it is still used and whether it relies on an API Adobe has deprecated or removed. Adobe publishes tooling and guidance for analysing code against a target version; check the documentation for the current tools that apply to your model. Anything nobody can explain is a risk, so flag it early.
Build a staging copy that mirrors production
You cannot judge an upgrade on an environment that differs from production. A useful staging copy has the same content structure, the same custom code, the same dispatcher rules and the same integrations, pointed at test accounts rather than live ones.
Pay attention to these details:
- Copy a recent snapshot of the repository so your real content, templates and user groups are exercised.
- Disable or redirect anything that could send real email, publish to live channels or write to live data.
- Keep the same publish and dispatcher topology if you can. A single instance hides caching and replication problems.
- Block search engines from the staging site and restrict access to your team.
Run the upgrade on staging exactly as you plan to run it on production, and write down every step, including the time it took and anything that needed manual repair. That log becomes your production runbook.
Write a test plan around key pages and forms
A test plan does not need to cover every page. It needs to cover the ones that matter and the patterns that repeat. Pick a sample for each template and component type, then add the pages the business cannot afford to lose.
- Top landing pages and the homepage: layout, images, navigation and structured data.
- Every form: submit it, confirm the confirmation message, and confirm the data reaches its destination, whether that is email, a CRM or a database.
- Search, login and personalised areas, if you use them.
- Author tasks: create a page, edit a component, upload an asset, start a workflow and publish.
- Caching and URLs: check that redirects, canonical tags and dispatcher cache invalidation still behave.
- Performance and accessibility: compare load behaviour and basic keyboard navigation before and after, using tools such as those described on web.dev.
Assign each test an owner and record a pass or fail. Include a few editors and marketers, not only developers, because they notice authoring regressions first.
Schedule the upgrade around the business
Choose a window when traffic and editorial activity are low, and avoid campaign launches, product releases and seasonal peaks. Announce a content freeze so nobody publishes during the cutover.
Decide in advance who is on call, who can approve a rollback and how you will communicate with stakeholders. Security fixes do not always wait for a convenient date, so keep an eye on Adobe’s security bulletins and decide how quickly you will apply urgent patches versus bundling them into the major upgrade.
Allow time after the cutover as well. A short period of closer monitoring catches problems that only appear under real traffic.
Prepare the rollback plan before you need it
A rollback plan is only real if you have tested it. Write it before the upgrade, and rehearse it on staging.
- Backups: take a full backup of the repository, the application files, your configuration and the dispatcher setup immediately before you start. Confirm you can restore from it.
- Decision point: define what counts as a failure, such as broken forms, failed publishing or errors on key pages, and who makes the call.
- Restore steps: list the exact order of operations, including stopping instances, restoring data, reverting dispatcher changes and flushing caches.
- Content created during the window: decide how you will handle edits made after the backup. A content freeze makes this simple.
- Time limit: agree how long you will troubleshoot before you roll back, so the decision is not made under pressure.
If you run AEM as a Cloud Service, rollback options differ because Adobe manages the platform. Check what your environment supports and keep your own code releases easy to revert.
Frequently asked questions
How long should an AEM upgrade take to plan?
It depends on how much custom code, how many integrations and which deployment model you have. A site with few customisations needs far less preparation than one with many bundles and templates. Let the staging rehearsal set your estimate rather than guessing up front.
Can I upgrade production without a staging copy?
You can, but it removes your only safe way to find breakage. Staging shows you which custom code fails, how long the steps take and whether your rollback works. Skipping it moves those discoveries into your live site.
Who should be involved in the test plan?
Include developers, content editors, marketing owners and whoever manages your integrations. Developers catch code and dispatcher issues, while editors and marketers catch authoring problems and broken forms that technical checks can miss.