How to Follow the Drupal Roadmap and Plan Your Upgrades

Drupal does not hide its direction. Plans, release notes, change records and security advisories are published in the open on drupal.org. The harder part is turning that stream of information into decisions for your own site. This guide shows where to look, what to read, and how to convert it into an upgrade plan you can schedule.

Know which sources are official

Use a short list of sources and ignore the rest. For roadmap and release questions, the authoritative places are all on drupal.org:

  • The Drupal core project page lists every core release, with release notes attached to each one.
  • Change records explain what changed in core and why, including deprecated APIs and what replaces them.
  • The security advisories page is where the Drupal Security Team publishes advisories for core and contributed modules.
  • Each contributed module’s project page shows its releases, supported core versions and issue queue.

Blog posts and social media summaries can be useful for context, but they are second-hand. When a summary and a release note disagree, the release note wins. Read the original before you commit budget or developer time.

Start with the Drupal core project page and bookmark the security advisories page. For background on how releases are structured, the Drupal documentation is the stable entry point.

Read a release note the useful way

A release note is not a to-do list for your site. Most of it will not apply. You are scanning for a handful of things that change your workload.

  1. Release type. Is it a security release, a bug-fix release, or a new minor release with features? Security releases usually need the fastest response. Feature releases can be scheduled.
  2. Deprecations. Deprecated code still works today but is scheduled for removal in a later major version. If your custom code or modules use it, that is future work.
  3. Requirement changes. New minimum versions of PHP, the database or other server components can force a hosting change before you can update Drupal itself.
  4. Update notes. Some releases ask you to run a specific step or review a setting after updating. Note these before you deploy, not after.
  5. Experimental or newly stable modules. A module moving from experimental to stable may let you retire custom code. A module being removed from core may need a contributed replacement.

Keep a simple running document with one line per release you read: what it changes, whether it affects you, and what you decided. That log becomes the evidence behind your upgrade plan.

Separate the three kinds of upgrade

Teams often use the word upgrade for very different jobs. Splitting them makes planning far easier.

Routine updates within your current version

These are the regular core and module updates delivered through Composer. They are small, frequent and should be part of normal maintenance. Test them on a copy of the site, then deploy through your usual process.

Minor version moves

A minor release adds features and sometimes raises requirements or deprecates APIs. Plan these deliberately. Read the release notes in full, check your custom code and contributed modules for compatibility, and test on a staging environment first.

Major version upgrades

A major upgrade changes the platform’s foundations. Drupal 10 and Drupal 11 are the supported major versions today, and Drupal 7 reached end of life on 5 January 2025, so a site still on Drupal 7 no longer gets official security coverage from the Drupal Security Team. Treat that as the most urgent item on any roadmap review.

Turn roadmap reading into an audit of your own site

Information only becomes a plan when you compare it to what you actually run. Build a short inventory and keep it current.

  • The core version and the PHP version your hosting uses.
  • Every contributed module and theme, with the version installed.
  • Every custom module and theme, and who maintains it.
  • Any patches applied through Composer, and why each one exists.
  • Integrations such as search, payment, single sign-on or CRM connections.

Then check each item against its project page on drupal.org. Look at whether a release exists for the next core version you are targeting, whether the module is still maintained, and whether the maintainers have flagged it as obsolete in favor of another approach. Modules with no compatible release are your real blockers, so find them early.

Core includes the Update Status module, which reports available updates for core and modules. Contributed tooling such as Upgrade Status can also scan a site for compatibility problems before a major move. Both are worth running as part of the audit, but check each project’s page for current requirements, because tooling depends on your setup.

Build the plan: a practical sequence

Once you have the inventory and the blockers, write the plan as a sequence rather than a wish list.

  1. Fix the platform first. Confirm your PHP and database versions meet the requirements of the core version you are heading for. Hosting changes often take the longest, so start there.
  2. Get current within your version. Apply outstanding updates before attempting a larger move. A site that is far behind makes every later step riskier.
  3. Remove what you do not need. Unused modules are upgrade cost with no benefit. Uninstall and remove them through Composer.
  4. Resolve blockers. For each module without a compatible release, decide whether to wait, replace it, fund a fix, or rewrite the feature.
  5. Update custom code. Use the deprecation reports to find and replace removed APIs. Automated tools can handle some of this, but review the changes by hand.
  6. Rehearse on staging. Clone the live site, run the upgrade, and test key journeys such as forms, search, checkout and editor workflows.
  7. Schedule the release. Pick a low-traffic window, take a verified backup, and agree a rollback decision point in advance.

Give each step an owner and a rough time estimate. Even an approximate schedule beats a vague intention to upgrade at some point.

Set a review rhythm

You do not need to read drupal.org daily. A steady rhythm is enough. Check security advisories on a regular schedule, and act on any that affect your installed modules. Skim new core release notes when they appear. Revisit the full inventory and upgrade plan on a fixed cycle, for example each quarter, and again whenever you plan a redesign or a major feature.

If you work with an agency or freelancer, ask them to share the same inventory and release log so everyone is looking at one source of truth.

Frequently asked questions

Where is the official Drupal roadmap?

Drupal’s direction is spread across drupal.org rather than held in a single page. Release notes, change records and the core issue queue together show what is planned and what has shipped. Use the core project page as your starting point, then follow links to the relevant change records.

How do I know when a security update affects my site?

Check the Drupal Security Team’s advisories on drupal.org/security and compare the affected project and version against your inventory. Core’s Update Status module can also flag available security updates for the code you have installed. Advisories name the fixed release, so your Composer update path is usually clear.

Should I upgrade as soon as a new version is released?

Not automatically. Apply security releases promptly, but move to a new minor or major version only after your modules and custom code are confirmed compatible and you have rehearsed the upgrade on staging. Being supported and being tested on your own site are both required.